Otto-Versand Head Office, Hamburg

30. June 2008

The buildings number 1 and 10 were erected in the 60s and 70s respectively. In the process of modernisation the whole interior on the ground floor was removed and redesigned. Lighting systems were integrated within a newly developed multi-purpose-channel in the ceiling. Straight lines featuring white LEDs generate a very dynamic environment which translates the philosophy of the multi-national group.